- 25,000 tons of non-hazardous, RCRA, and PCB soil.
- Utilized 4 separate hazardous and non-hazardous landfills.
- Utilized 6 separate transporters.
- Drivers required weekly passes to gain access to the site.
- AWMS managed all aspects of this project including: scheduling 60 loads per day from the site, site and transporter approval, manifesting, and billing with backup documentation.
- AWMS was able to manage this project without demurrage charge, even though the job was routinely shut down for Air Force traffic.